Energy-Efficient Industrial Unit Refurbishment – West Sussex

UK Electrical delivered a full industrial electrical refurbishment in West Sussex, including an 80 kW PV solar array, complete mains panel upgrade, smart LED lighting, and compliance systems – transforming the facility into a modern, sustainable, and energy-efficient workspace.

UK Electrical was appointed to deliver the full electrical refurbishment and high-quality fit-out of an existing industrial unit in West Sussex. The works aimed to modernise the facility, improve operational efficiency, and enhance sustainability while meeting the client’s strict quality requirements and challenging programme deadlines.

Sustainable Energy & Advanced Infrastructure

Working closely with the client and other contractors, our team designed and implemented a complete upgrade of the building’s electrical and mechanical systems, integrating sustainable energy solutions with advanced infrastructure to ensure long-term performance and compliance.

Power Infrastructure Upgrade

UK Electrical delivered a full power infrastructure upgrade to future-proof the facility’s electrical capacity and efficiency. This involved replacing the existing system with a 1000 A mains panel with integrated metering for precise monitoring and control, along with split-metered submain distribution to provide accurate energy data for different areas or tenants, improving transparency, cost control, and flexibility.

Solar Power Installation in West Sussex

Location: West Sussex
PV Capacity: 80 kW
Mains Panel: 1000 A with integrated metering
Lighting: Smart DALI-controlled LED
Programme: Completed on time

Key features of the refurbishment

Power Infrastructure Upgrade: Complete replacement of the electrical infrastructure and installation of split-metered submain distribution for clear, accurate energy monitoring across multiple areas or tenants.

Sustainable Energy Installation: Installed an 80 kW photovoltaic (PV) array to significantly reduce reliance on grid power and lower the site’s carbon footprint.

Electrical Fit-Out: Complete installation of small power systems throughout the facility. Smart DALI-controlled LED lighting for energy efficiency, user comfort, and enhanced control.

Safety & Compliance Systems: New addressable fire alarm system for reliable site-wide detection and compliance with current regulations.

Mechanical & Environmental Systems: Mechanical extraction systems to maintain air quality and meet workplace standards. Electric heating and water heating to meet comfort and welfare requirements.

Public Health Systems: New sanitary ware, drainage, and kitchen supplies for staff welfare and hygiene.

Project challenges

The project required precise coordination to ensure all works were completed without disrupting the client’s wider operational programme.

  • Careful sequencing of works to allow parallel activities.
  • Early procurement of specialist equipment such as PV modules and the mains panel to mitigate supply chain risks.
  • Close collaboration with the client and stakeholders for rapid decision-making.

Energy-Efficient Industrial Unit Refurbishment

The project required precise coordination to ensure all works were completed without disrupting the client’s wider operational programme.

Conclusion

UK Electrical delivered a full power infrastructure upgrade to future-proof the facility’s electrical capacity and efficiency. This involved replacing the existing system with a 1000 A mains panel with integrated metering for precise monitoring and control, along with split-metered submain distribution to provide accurate energy data for different areas or tenants, improving transparency, cost control, and flexibility.