Unit 2 Langege Science Park, Plymouth.
UK Electrical delivered a full turnkey M&E installation in Plymouth, including a 1250A panel board, LED lighting, HVAC, fire alarm, and PV system. Creating a safe, efficient, future-ready facility.
The project aimed to deliver a modern, efficient, and sustainable site infrastructure that meets both current operational needs and future expansion requirements. The works were successfully completed on time and within budget, meeting the client’s expectations for quality, safety, and energy performance.
Focus on Renewables
The project featured renewable energy integration with a photovoltaic (PV) system, reducing the facility’s carbon footprint, offsetting electrical demand, and supporting long-term sustainability through clean, efficient on-site energy generation.
A Complete Turnkey M&E Solution
This project stands out for its scale, scope, and integration, delivering a full mechanical and electrical infrastructure under a single contract.
Unlike projects that focus solely on one discipline, UK Electrical combined seamlessly a 1250A panel board with integrated metering through to renewable PV systems, HVAC, lighting, and life safety installations, demonstrating the company’s capability to deliver a comprehensive, future-ready turnkey solution for large-scale industrial environments.

Location: Plymouth, Devon
Value: £400,000
Works: The project delivered a 1250A metered panel board, full LED lighting, new fire alarm, HVAC, ventilation, and water systems, plus an integrated PV system to boost efficiency and sustainability.
Key Features of the M&E Installation
Power Distribution
Installation of a new 1250A panel board to support high-capacity industrial operations, including a new submain distribution network with integrated metering systems to enhance energy efficiency monitoring and cost control.
Lighting & Power
Full installation of LED lighting throughout the facility, reducing energy consumption and long-term maintenance costs. Provision of new small power supplies to support operational equipment and office functions.
Life Safety Systems
Installation of a new addressable fire alarm system for reliable detection and streamlined site-wide monitoring, ensuring compliance with fire safety regulations.
HVAC & Ventilation
Complete installation of ventilation and air-conditioning systems, delivering a controlled, comfortable, and compliant internal environment.
Public Health Services
Installation of new water and waste services to support day-to-day building operations and staff welfare.
Renewable Energy
Integration of a photovoltaic (PV) system, reducing the facility’s carbon footprint and offsetting electrical demand through sustainable energy generation.
Project Challenges & Solutions
Coordination in a live industrial environment: Careful planning and phasing ensured minimal disruption to ongoing operations.
Energy efficiency targets: The integration of LED lighting, PV, and metered distribution systems provided long-term sustainability and operational savings.
Tight programme deadlines: Works were delivered on schedule through close collaboration between design, site, and client teams.
A Turnkey M&E Installation
Delivering a full M&E installation in a live industrial environment required careful planning and collaboration.




Conclusion
The Plymouth facility was delivered on time and on budget, providing a modern and efficient infrastructure that is safe, sustainable, and future-ready. The installation not only enhances operational performance but also reduces energy demand and improves maintainability, offering long-term value for the client.