Unit 1 Forge Lane, Minworth.
The project incorporated advanced HVAC systems, efficient lighting, and BREEAM-compliant solutions, ensuring optimal performance and environmental responsibility.
A project that demonstrates our unwavering commitment to excellence and sustainability. By tailoring our services to meet and exceed client expectations, we demonstrated our expertise in delivering efficient, compliant, and future-focused solutions.
Sustainability Focus for M&E Project
Throughout the project, sustainability remained at the forefront of our approach. From energy-efficient installations to environmentally conscious water management systems, every element was designed with the goal of reducing the environmental footprint and ensuring long-term efficiency.
BREEAM-Compliant Grey Water Harvesting at Forge Lane
To promote water conservation and reduce the building’s environmental impact, we installed a BREEAM-compliant grey water harvesting tank in the plant room. These systems collect and reuse water from non-potable sources, such as sinks and showers, reducing demand on mains supplies. By integrating this system, we contributed to water efficiency and supported the project’s high BREEAM credits.
Achieving compliance with these rigorous standards demonstrates UK Electrical’s extensive expertise in delivering environmentally responsible solutions. Aligning M&E installations with BREEAM requirements effortlessly.
Location: Minworth
Value: £1,000,000.00
Timescale: 18 Weeks
Works: UK Electrical delivered a comprehensive, sustainable M&E installation at Unit 1 Forge Lane, Minworth, featuring advanced HVAC, lighting, and BREEAM-compliant solutions.
Key features of the electrical fit-out
Complete Design of M&E Services
Our journey began with crafting a detailed, bespoke design for the Mechanical and Electrical services. This ensured all systems were tailored to the premises’ specific needs, meeting both functionality and industry compliance.
Advanced Lighting Installation
We enhanced the workspace with a state-of-the-art lighting system, prioritising both energy efficiency and user comfort. The newly installed lighting boosts functionality while reducing energy consumption.
Small Power Circuits
To ensure the building’s operational needs are met, we installed new small power circuits. These additions guarantee sufficient and reliable power for all essential equipment.
1600A Mains Electrical Panel
A robust 1600A mains electrical panel, manufactured by Hager, was installed to support the premises’ current and future electrical requirements. This setup is future-proofed, ready to integrate solar installations as part of ongoing sustainability efforts.
HVAC System Installation
To provide a comfortable working environment, we installed modern air conditioning and ventilation systems throughout the office spaces. This system ensures optimal temperature control and air quality.
Modern Washroom Facilities
We revamped the washroom facilities, equipping them with extract ventilation and electric water heating systems. These upgrades enhance comfort and comply with health and safety standards.
BREEAM-Compliant Grey Water Harvesting
Sustainability was a key priority for this project. We installed a BREEAM-compliant grey water harvesting tank in the plant room, promoting water conservation and reducing environmental impact.
MEP Luxury Office Fitout
The office space required a high-end and adaptable electrical fitout to meet both current and future needs.
Conclusion
The successful completion of the M&E works at Unit 1 Forge Lane, Minworth, demonstrates UK Electrical’s expertise in delivering tailored, high-quality installations. By prioritising both functionality and sustainability, we provided a future-ready solution that meets the client’s immediate needs while aligning with broader environmental goals. This project reinforces our position as a trusted partner for innovative and sustainable M&E solutions.